48 of 48 states verified against official sourcesLast update October 2026 · How we verify
Home / States / Michigan
Michigan DOT Transport Permits Unit

Michigan oversize load rules

Legal limits, pilot car requirements, travel restrictions, superload thresholds and permit fees for oversize and overweight loads in Michigan.

Legal limits without a permit

Width8′6″ on designated highways · 8′ elsewhere
Height13′6″
Length53′ semitrailer and 65′ combination on designated highways · 50′ and 59′ elsewhere · 40′ single vehicle
Weight80,000 lb gross

At a glance

Escorts2 escort rules, starting at 14′ wide
Superload3 review triggers (height, length, width)
Travel5 restrictions (curfews, night, holidays)
Fees4 published fee lines

Escort (pilot car) requirements

Pro members see the full Michigan escort rules:
  • 2 width, height and length thresholds with the escort count for each
  • Overhang and route-type conditions
Start 7-day free trial Sign in

Travel restrictions

Pro members see the full Michigan travel restrictions:
  • 5 restrictions: curfews, night travel, weekends and holidays
  • Which ones apply to a given load size
Start 7-day free trial Sign in

Superloads

Pro members see the full Michigan superload rules:
  • Exact thresholds and what the state requires past them
  • Lead times, route surveys and police escort conditions
Start 7-day free trial Sign in

Permit fees

Pro members see the full Michigan permit fees:
  • 4 published fee lines with links to the fee schedule
  • Validity periods and add-on charges
Start 7-day free trial Sign in

Common questions

When does a load need a pilot car in Michigan?

Over 14′6″ high always needs a lead escort with a height pole. Other escorts are written into each permit as special provisions rather than set by a published table.

Can oversize loads travel on weekends in Michigan?

Only by request, and only for loads within 10′ wide, 14′ high and 90′ long: all day Saturday and Sunday until 3 PM. Otherwise permits are Monday through Friday in daylight.

What is the largest load Michigan will permit on a single trip?

16′ wide, 15′ high and 150′ long. Beyond that the shipper must justify the move and submit a route survey at least ten working days ahead.

Sources

Planning reference. Permits carry their own conditions, and city and county roads have separate rules. Confirm with the Michigan DOT Transport Permits Unit before moving a load. Found an error? Report it.

Other states: Alabama · Arizona · Arkansas · California · Colorado · Connecticut · Delaware · Florida · Georgia · Idaho · Illinois · Indiana · Iowa · Kansas · Kentucky · Louisiana · Maine · Maryland · Massachusetts · Minnesota · Mississippi · Missouri · Montana · Nebraska · Nevada · New Hampshire · New Jersey · New Mexico · New York · North Carolina · North Dakota · Ohio · Oklahoma · Oregon · Pennsylvania · Rhode Island · South Carolina · South Dakota · Tennessee · Texas · Utah · Vermont · Virginia · Washington · West Virginia · Wisconsin · Wyoming